Appendix

Appendix A - Organization Supporting Material

Extra detail that supports our Team Organization page-notes.

Notes & Brainstorms

  • Assumptions: rugged embedded device for wildfire response; glove-friendly screen+buttons; internet-optional comms (ESP-NOW/LoRa); outdoor sun/dust.
  • Key metrics: ≤1 s alert latency; 99% message delivery (n≥100 in lab); >95% detection accuracy for chosen condition; ≤3 actions for core task.
  • Constraints: course timeline, limited budget, safe lab surrogates (no open flame), simple enclosure & power budget.
  • Why this scope: maximizes embedded-systems learning while remaining demo-feasible; clear pass/fail tests.

Team Organization Steps

  • Expectations Charter: response time ≤24h on chat; meetings start on time; escalate blockers after 2 days.
  • Conflict Path: 1:1 → team discussion (15 min timebox) → instructor input if unresolved.
  • Peer Reviews: every PR needs one review; use a 3-item checklist (builds clean, tests noted, docs touched).

Team Roles

Name Role Primary Deliverables
Vinny Project Manager / Team Lead Project timeline & coordination; task assignments & follow-ups; meeting agendas/notes; risk & scope management; instructor/stakeholder communication.
Emonie Documentation Lead Report drafting & editing; citation management; submission packaging; Google Drive organization & version control; compliance with course formatting.
Amanda Design & Branding Lead Slide templates and graphics; diagrams/figures; logo and visual assets; UI mockups as needed; visual consistency across deliverables.
Danitza Research Lead Literature & standards review; sensor/comms trade studies; evidence-backed recommendations; source summaries; data collection planning.
Erjan Electronics Lead Circuit design & prototyping; PCB layout and BOM; component selection; firmware integration support; bench bring-up and debugging.
James Test & Validation Lead Test plans & procedures; unit/system testing; data logging & analysis; acceptance criteria; demo readiness checks and issue tracking.

Note: team members may support multiple roles as project needs evolve.

Decision Log (Template)

Date:
Topic:
Options Considered:
Criteria & Tradeoffs:
Decision:
Owner:
Revisit If:
          

Communication Channels

Preferred modes for each team member.

Name First Choice Communication Second Choice Communication Third Choice Communication
Vinny Panchal Group Text Phone Call Email / Canvas
Emonie France Group Text Phone Call Email / Canvas
Amanda Pizarro Group Text Phone Call Email / Canvas
Danitza Jimenez Group Text Phone Call Email / Canvas
James Austin Group Text Phone Call Email / Canvas
Erjan Baigenzhin Group Text Phone Call Email / Canvas

Notes: “Group Text” refers to the team chat chosen by the group (iMessage/Text Message/WhatsApp/Discord). Call = direct phone/audio. Email/Canvas for formal or instructor-facing items.

Communication Procedures

  • Async (default): Group text for day-to-day updates, quick questions, and coordination. Response expectation: within 24 hours; reactions are OK for simple acks.
  • Sync (when needed): Phone call for blocking issues, time-sensitive decisions, or pair-debugging. Set a 15-30 min timebox; post a short summary in the group chat afterward.
  • Formal / Records: Email (cc the team) or Canvas for deliverables, instructor questions, and decisions that need a paper trail.
  • Instructor correspondence: Primary point of contact: Vinny (sends/receives), with all members cc’d. Vinny posts a 2–3 line recap + links in the group chat within 12 hours of any instructor reply.
  • Shared files: Google Drive is the source of truth for docs and assets: Team Drive Folder. Naming: EGR314 - Deliverable - vYYMMDD - Owner (e.g., EGR314 - P1 Slides - v250915 - Vinny).
  • Escalation path: 1) ping in group chat → 2) quick call within 24h → 3) escalate to instructor if blocked & deadline risk.

Availability Matrix

Summary of the teams overall availability based on the survey form.

Member Sun Mon Tue Wed Thu Fri Sat
Vinny x x x x
Emonie x x x x
Amanda x x x x
Danitza x x x x
Erjan x x x x
James x x x x x

Meeting Template

Agenda:
1) Check-in & blockers (5m)
2) Progress since last review (10m)
3) Decisions needed (10m)
4) Next steps & owners (5m)

Notes:
- …